广州澳恒建筑装饰材料有限公司官网,欢迎您!
广州澳恒

铸就高品质自流平水泥行业品牌

服务热线

020-38667794
澳恒

联系澳恒

广州市澳恒建筑装饰材料有限公司

联系电话:020-38667794

电子邮箱:243105639@qq.com

公司地址:广州市天河区棠东萝卜坑路68号A1栋206

立即咨询 在线留言

自流平水泥怎么施工?

发布时间:2020-01-29 点击次数:2150

自流平水泥是怎么施工?澳恒自流平水泥系列产品由于型号不同,基础地面不一样,使用用途不一样,施工工艺也有所不同。本文只对自流平水泥施工的一般流程做一个描述,具体产品的施工工艺请查阅澳恒公司相关产品的施工流程和具体要求。

1、对基础地面的要求:混凝土地面强度要达到C20以上

2、对施工环境的要求:施工温度最好10°C以上,避免5°C以下施工。过于潮湿的环境不宜施工。

3、基础地面处理:先用打磨机对基础地面进行粗磨,去掉松散的物质。

4、涂刷专用界面剂(并不是所有的乳液都可以做界面剂)

5、按厂家规定精确加水,澳恒自流平水泥不同型号的产平,兑水量不一样,建议用电子秤秤量。

6、用自流平水泥专用搅拌机搅拌均匀,连续搅拌时间2-3分钟(不同产品,搅拌时间不一样)

7、将搅拌好的浆体按施工要求倒在施工面上,用施工刮耙促流和定厚

8、用消泡滚筒消除气泡和高低差

具体操作可观看澳恒自流平水泥施工视频

澳恒彩色面层自流平水泥施工图

广州澳恒自流平施工过程

本文出自广州澳恒建筑装饰材料有限公司官网,转载请注明出处!


相关文章:

1、自流平水泥有哪些优点和缺点?

2、界面剂在自流平水泥施工中有什么作用?



How is self-leveling cement constructed? Due to different models, Aoheng self-leveling cement series products have different foundations, different uses and different construction techniques. This article only describes the general process of self-leveling cement construction. For the construction process of specific products, please refer to the construction process and specific requirements of relevant products of Aoheng Company.


1. Requirements for foundation ground: the strength of concrete ground should reach above C20

2. Requirements for the construction environment: the construction temperature is preferably above 10 ° C, avoid construction below 5 ° C. Excessively humid environment is not suitable for construction.

3. Foundation ground treatment: firstly grind the foundation ground with a sander to remove loose materials.

4. Apply special interface agent (not all emulsions can be used as interface agent)

5. Accurately add water according to the manufacturer's regulations. The output of different types of Aoheng self-leveling cement is different.

6. Use a self-leveling cement special mixer to mix evenly, with continuous mixing time of 2-3 minutes (different products, the mixing time is different)

7. Pour the agitated slurry on the construction surface according to the construction requirements, use the construction scraper to promote the flow and set the thickness.

8. Use the defoaming roller to eliminate air bubbles and height difference.


Specific operation can watch the construction video of Aoheng self-leveling cement.

Aoheng color surface layer self-leveling cement construction drawing

Guangzhou Aoheng self-leveling construction process




This article is from the official website of Guangzhou Aoheng Building Decoration Materials Co., Ltd. Please indicate the source when reprinting!




Related articles:


1. What are the advantages and disadvantages of self-leveling cement?

2. What role does the interface agent play in the construction of self-leveling cement?


澳恒
澳恒

扫一扫关注微信

  • 联系方式
  • 公司名称:广州市澳恒建筑装饰材料有限公司
  • 公司地址:广州市天河区棠东萝卜坑路68号A1栋206
  • 联系方式:020-38667794
  • Email: 243105639@qq.com
版权所有© 广州市澳恒建筑装饰材料有限公司 备案号: 粤ICP备16122448号 技术支持: 京马网   傲马系统

粤公网安备 44010602006829号